Torex steel doors. Migration from 1C:UPP to 1C:ERP

Client company

Torex Steel Doors LLC, Samara https://torex.ru

Industry

metalworking

About the company

Torex is a Russian manufacturer that has been making steel doors since 1990. The plant is located in Samara. It is the No. 1 entrance door brand in Russia, with 4,500 stores in Russia and abroad, covering 80 regions and 13 countries.

Base solution

1C:ERP Enterprise Management

Automated areas

  • Production management
  • Operational accounting
  • Revenue contract management
  • Service and warranty management for products
  • Sales planning
  • Warehouses
  • Inventory management

Results

  • Significantly shortened production lead times and, as a result, reduced costs
  • Implemented accurate production cost calculation
  • Fully automated dispatching of metalworking production
  • Automated production process management at the shop-section level
  • Revenue contract management by customer order
  • Service and warranty management for manufactured products

Migration to 1C:ERP from 1C:UPP and a custom-built production system

Headcount: 1,200 employees

Project duration: 12 months
Number of workstations (user seats): 50

Industry: metalworking

Solution implemented: 1C:ERP

Objective

  • Link all economic calculations to the production system
  • Move the custom-built production management add-on to out-of-the-box 1C:ERP functionality

Project goals

  • Switch to the out-of-the-box functionality of 1C:ERP
  • Automate production economics. Calculate accurate product costs
  • Fully automated dispatching of metalworking production
  • Automated production process management at the shop-section level
  • Revenue contract management by customer order
  • Service and warranty management for manufactured products

Project specifics

Parameterization and bill of materials challenges.

Situation before the project

Initially, the company had a custom-built production system based on 1C:ERP, and a very well-built one. But when it was developed, production economics was completely overlooked. As a result, the company managed production well but could not perform even basic cost calculations. We joined the project when production had already been automated, and correct costing had to be implemented on top of that automation.

“1C strongly advises against custom-coding anything in the part of the system related to costing. This core is based on very complex calculations. It is easy to break and sometimes impossible to restore” — Evgeny, functional architect of the project

Project progress

Initially, the entire door production cycle started only after a customer order was received: purchasing or producing the semi-finished products required for the customer, assembly, painting, and so on.  This led to long order lead times.

The client believed its line of business could not run on standard functionality, because semi-finished products could not be standardized: each door is made individually to customer requirements. Consulting and analysis revealed that all semi-finished products could be divided into several types.

We managed to standardize all semi-finished products

  • Door thresholds
  • Door frames in a standard range of 60/70/80/90/100 cm
  • Door leaves by metal thickness: 0.6/0.7
  • Lock type: a wide model range, up to touch-controlled locks
  • Glazed/unglazed
  • Glass type
  • Glass frame type

Blanks could now be produced in advance. To customize a door to a customer order, only assembly and painting remained. This significantly shortens production lead times and reduces costs, since production capacity utilization is inversely proportional to costs

Conclusions

Manufacturers often believe that a particular automation approach does not suit them because each of their products is unique and made to order. But our experience shows that even this kind of production can be standardized and automated.

Rely on our experience.

You may also be interested in the following materials

FREGAT. 1C:ERP implementation at a refined lead production and processing plant

Industry:metallurgy
Product:1C:ERP Enterprise Management
Learn more

KRASMASH. Integrated 1C:ERP implementation at a heavy machinery plant

Industry:machinery and instrument manufacturing
Product:1C:ERP Enterprise Management
Learn more

AEMZ. Integrated automation with 1C:ERP and integration with a custom-built 1C-based MES

Industry:metallurgy
Product:1C:ERP Enterprise Management
Learn more

StroyTransNefteGaz JSC. Implementation of 1C:ERP Construction Management

Industry:constructionpetrochemicals and underground gas storage
Product:1C:ERP Enterprise Management